Choosing a structural system is one of the earliest and most expensive decisions on any commercial project. In 2026 the gap between structural steel and mass timber has narrowed, but the headline price per square foot still hides most of the story.
What the numbers look like today
On a mid-rise office of roughly 100,000 square feet, steel frames still come in modestly cheaper on structure alone. Mass timber closes much of that gap once you account for the work it removes from the rest of the schedule.
- Structure: Steel is typically 5–10% cheaper for the frame itself, depending on current fabrication lead times.
- Foundations: Timber is far lighter, so footings and piers can shrink noticeably on poor soils.
- Fire protection: Steel needs intumescent coatings or encasement. Timber relies on char depth, which is often exposed and finished as-is.
- Finishes: Exposed timber ceilings can replace drop ceilings and paint, saving both cost and weeks.
Schedule is where timber earns its keep
Mass timber panels arrive cut to tolerance and are craned into place in days. A typical floor plate goes up faster than steel with metal decking and a concrete topping, because there is no pour and no cure time to wait for.
When steel is still the right call
Long clear spans, heavy industrial loads and very tight budgets still favour steel. If your project has any of these, a hybrid frame is often the best compromise.
Conclusion
There is no universal winner. Price both systems early, include foundations, fire protection and schedule in the comparison, and let the real numbers decide. We run this side-by-side study for every project before design is locked.